Builder Partners
Pennslyvania Builders:
- Calvin Smoker Builder
- Clyde Stumpf & Son, Inc.
- E.G. Stoltzfus Homes
- Garman Builders, Inc.
- Metzler Home Builders, Inc.
- Millfield Construction Co.
- Landmark Homes
- Horst & Son, Inc.
Maryland Builders:
Technical Resources
Videos
Builder Guideline Booklet
- Builder Guideline Booklet
- Homeonwer Guide
- Builder's Checklist
- Code Inspector's Checklist
- Concrete Work Checklist
- Excavator's Checklist
- Framer's Checklist
How To's
- Adding a Door to R5
- Adding a Door to Xi
- Adding a Patio Door to R5
- Adding a Patio Door to Xi
- Attaching a Circuit Break Panel
- Attaching a Deck
- Drilling a Hole through the Bond Beam - R5
- Drilling a Hole through the Bond Beam - Xi
- Drywall Block Details
- Electrical Wiring - Xi
- Exterior Holes in Superior Walls Panels
- Pouring Concrete Floor Slab
- Steel Angle Attached
- Top of Wall Attachments
Code Evaluation Reports
How to Order Your Superior Walls Foundation
A. Four items are initially required to order your Superior Walls
- Completed Credit Application
- Signed Estimate
- Signed Purchase Order / Agreement
- Deposit Check
B. Superior Walls then provides
- Plan / Schematic CAD Drawings
- 3D Drawings
- Revised Final Proposal (based on your final drawing approval)
C. Your Foundation Becomes an Order When:
We received your signed approval of all CAD drawings and a signed proposal. A Customer Service team member will contact you to verify schedule.
Note: It is imperative that we have access to the jobsite and that is it prepared correctly for a smooth, quick, and high-quality installation. The Site Preparation Sheet/Checklist explains in detail the requirements for access and properly preparing your jobsite for installation. If you site has questionable access, please call your Sales Representative.
A foot inspection on the soil may be required by inspectors prior to setting the stone in the excavated site. Call you code official concerning this phase.
When your site is excavated, the stone has been set, and the outside corner pins installed, please call Doug Pfautz at 717-733-4823 to inform him that the site is ready for installation. You will be contact by a member of our Customer Service team to verify:
- You are ready for us to manufacture your foundation walls
- The jobsite is ready for our set crews to install your foundations walls
D. On the Day of Installation
Our set crew arrives to complete final site preparation which includes shooting laser elevations, setting string lines off of the corner location pins you have established, and final compaction of the stone. The crane and the walls arrive on site for installation. Set crew installs foundation and cleans site when finished.
You're now ready to start building!
Download Our Credit Application:
Credit Application.pdf
Credit Application.doc
Call 717-733-4823 or contact us online for more information on our Superior Wall Systems.


